Main technical parameters and requirements of the Paper hardboard production line

Model: YZB60-1600 Industrial Hardboard Production Line

1. Design speed: 60m/min Economic speed: 30-40m/min

2. Effective working width: 1800mm

Note: The base paper used for production line speed testing should meet the following requirements:

*The grade of the base paper shall not be lower than Grade B * The moisture content of the base paper shall be 11% ± 1%

3. Total power of equipment: about 75kw Common power of equipment: about 60kw

4. Drive power supply: 380V Control power supply: 220V 50Hz three-phase four wire system

5. Equipment and appliances: China Chint

6. Pneumatic components: Asahi, China

7. Steam rotary joint, metal hose: Shandong Tengzhou Guanqiu

8. Equipment control working pressure:
0.6-0.9 MPa

9. Production line length: approximately 25 meters (based on foundation drawings) Equipment footprint: 35m ×  8.2m ×  3.8m

10. autoamtic hardboard production line flow direction: Determine the left or right position of the transmission according to the user’s factory.

Customer provided portion

Electric shaftless bracket

technical parameter

*Paper clamp diameter: large Φ 1400mm small Φ 350mm

*Unilateral heavy load: up to 2000kg

*Gas source working pressure (MPa):
0.6-0.9 MPa

*Equipment total power: 5kw Working power supply: Voltage 380V Frequency 50Hz

Structural characteristics

*The symmetrical structure can simultaneously install two bundles of original cylinder paper for non-stop paper changing operations.

*Using electric drive, it can complete the lifting, clamping, releasing, and moving alignment of the raw paper.

*The paper clip head adopts a conical design.

*The tension control adopts pneumatic brakes and manually adjusts the air pressure.

Main purchased parts, raw materials, and place of origin

*The main shaft and clamping arm of the bracket are made of steel plate welded from Jigang

*The two side wall panels are made of HT200 castings. Origin: Hebei Province

*Bearings: Choose Ha, Wa, or Luo products

*Electrical appliances: produced by Zhejiang Chint

*Pneumatic components: Zaozhuang Origin: Shandong

Paper trolley, ground rail

Structural characteristics

*Push the raw paper into place, lightweight and flexible.

*The track is buried as a whole, and the main frame is welded with 12 channel steel, which is sturdy and durable.

*The upper cover steel plate shall be welded after on-site installation.

*Two paper loading carts are equipped to load paper from both sides.

Raw materials and purchased parts

*Track and trolley materials: profiles produced by Tangshan Iron and Steel and Jinan Iron and Steel Group

*The bearings are made of Ha, Wa, and Luo products

Three layer preheater

technical parameter

*Preheating roller diameter: Φ400mm

*Surface temperature: 150-200 ℃

Structural characteristics

*The surface of each roller is polished and chrome plated, which is smooth and durable.

*Manually adjustable package angle, adjust paper preheating area.

*Preheating roller, paper guide roller, electroplating treatment.

Raw materials and purchased parts

*Material of both side wall panels: HT200 Casting Origin: Hebei

*Material of paper guide roller: No. 20 steel Origin: Baosteel

*Preheating roller material: 20G steel, wall thickness 16mm Origin: Jinan Iron and Steel Group

Double layer conveyor bridge
technical parameter

*Paper guide roller: Φ85mm

Structural characteristics

*Two layers of paper guide shafts on the bridge, manually adjust the balance of the paper shafts.

Raw materials and purchased parts

*The main bridge frame channel steel is made of No. 20 steel, produced by Ansteel

www.wdcartonmachine.com

14mm-hardboard-production-line-supplier hardboard production line6

www.wdcartonmachine.com/products

www.wdcartonmachine.com

If you are also interested in this machine,please don’t hesitate to contact us:

 

Overseas manager: Tom Wang

 

Email:cartonmachine.tomwang@aliyun.com

 

Phone/Wechat/Whatsapp:+86 13303078975


Post time: Jan-04-2025