Daily maintenance of ink printing sewage treatment machine can be started from the following aspects.
1. Check safe and reliable fasteners and control devices.
2. Check the necessary parts, adjust the clearance of moving parts, and replace vulnerable parts.
3. Clean, check and adjust electrical components. Check whether the electrical contact is good and whether the wiring is firm.
4. Thoroughly clean and wipe the dead corners on the internal and external surfaces of the equipment, and remove the surface burrs.
5. Dismantle, inspect, adjust and maintain the equipment if necessary.
6. Keep clean, natural, smooth, clean and lubricated. The equipment operates flexibly and normally.
If you are also interested in this machine,please don’t hesitate to contact us:
Overseas manager: Tom Wang
Email:cartonmachine.tomwang@aliyun.com
Phone/Wechat/Whatsapp:+86 13303078975
Post time: Dec-20-2023