The maintenance of Carton machinery and equipment is generally divided into the following three stages:
Aging maintenance. The outstanding feature of this maintenance method is that it can be maintained only when the machine is aging and damaged; No spare parts management and ordering plan; There is no fixed maintenance plan
Preventive maintenance. This maintenance method is carried out according to the predetermined time period: there are specified maintenance forms for reference: there is no shutdown record and analysis, which can relatively reduce the shutdown rate of the machine.
Productive maintenance. This maintenance method can follow the rules and carry out maintenance and replacement according to the equipment instructions: the spare parts system is relatively perfect; The equipment can operate at low cost and high output.
Tom (oversea manager) Phone:0086 13303078975 / 17772697357(whatsapp,wechat,line)
Email :cartonmachine.tomwang@aliyun.com
https://www.wdcartonmachine.com
Post time: Sep-06-2021